Arburg Expands U.S. Headquarters
Adding more than 80% more space in Rocky Hill, Conn.
In June, Arburg, Inc. broke ground to expand its U.S. offices in Rocky Hill, Conn. “Our headquarters, which was newly built as recently as 2015, has already met its capacity limits,” explains Friedrich Kanz, CEO of the U.S. operation. When completed in mid-2020, the project will add 23,000 ft2, or more than 80%, to the size of the current building. This will provide more space for setup and acceptance testing of complete turnkey automation projects, customization of stock machines, and considerably larger spare-parts stock. Rooms will be added for offices, customer training and technical seminars.
Related Content
-
Process Monitoring or Production Monitoring — Why Not Both?
Molders looking to both monitor an injection molding process effectively and manage production can definitely do both with tools available today, but the question is how best to tackle these twin challenges.
-
What to Look for in High-Speed Automation for Pipette Production
Automation is a must-have for molders of pipettes. Make sure your supplier provides assurances of throughput and output, manpower utilization, floor space consumption and payback period.
-
Use These 7 Parameters to Unravel the Melt Temperature Mystery
Despite its integral role in a stable process and consistent parts, true melt temperature in injection molding can be an enigma. Learning more about these seven parameters may help you solve the puzzle.