Processing Index Contracts as Coronavirus Disrupts Economy
COVID-19 results in weaker new orders, production dips and a disrupted supply chain in March. But for how long?
These are unsettling and somewhat confusing times in plastics processing. On the one hand, anecdotal evidence suggests processors were extraordinarily busy in March, responding at breakneck speeds to demands for medical products and packaging of all kinds spurred by COVID-19. Sources say some molders with capacity constraints even turned to their machine suppliers to run parts for them. On the other hand, all this activity was not reflected in March’s Plastics Processing Business Index, which dipped to 43.5.

FIG 1 After a nascent recovery appeared to be at hand earlier in the year, the Plastics Processing Business Index contracted sharply as the world’s economy was ordered to close in hopes of slowing the spread of COVID-19.
Gardner Intelligence reports that several components of the Index—calculated as an average of its components—reached all-time lows, including new orders, export orders, production and employment. Remember, though, that these readings represent the breadth of change occurring within the plastics processing industry and should not be confused with the rate of decline taking place. These low readings indicate only that a large proportion of the industry reported decreased levels of ´óÏó´«Ã½ activity.
The reading for supplier deliveries moved significantly higher. In normal times when demand for upstream goods is high, supply chains cannot keep pace with these orders. The resulting backlog of supplier orders thus lengthens their delivery times. This delay causes our surveyed firms to report slowing deliveries. By the survey’s design, when this slowing effect occurs it elevates the supplier deliveries reading. The world’s efforts to slow the spread of COVID-19 has significantly disrupted supply chains worldwide.

FIG 2 The reading for supplier deliveries is designed to increase when supplier deliveries slow, under the assumption that suppliers are experiencing higher backlogs and need longer to get goods to manufacturers. In the current situation, though, it is COVID-19’s massive disruption to the world’s supply chains that is causing those longer delivery times and the supplier delivery figure to rise
While the majority of information we received from the market pointed to a challenging March, suppliers to plastics processors reported that all elements of their ´óÏó´«Ã½ activity expanded, the first time such an event has occurred in recorded history.
About the Author: Michael Guckes is chief economist and director of analytics for Gardner Intelligence, a division of Gardner Business Media, Cincinnati. He has performed economic analysis, modeling, and forecasting work for more than 20 years among a wide range of industries. He received his BA in political science and economics from Kenyon College and his MBA from Ohio State University. Contact: (513) 527-8800; mguckes@gardnerweb.com.
Related Content
-
What to Know About Your Materials When Choosing a Feeder
Feeder performance is crucial to operating extrusion and compounding lines. And consistent, reliable feeding depends in large part on selecting a feeder compatible with the materials and additives you intend to process. Follow these tips to analyze your feeder requirements.
-
How to Configure Your Twin-Screw Extruder for Mixing: Part 5
Understand the differences between distributive and dispersive mixing, and how you can promote one or the other in your screw design.
-
More Than a Compounder: They Have the Science to Create New Custom Materials
Insight Polymers & Compounders leverages its expertise in polymer chemistry to develop next-generation materials.